Austin, Texas HQ · Delivering AI programs across the United States contact@saabsa.com · Typical reply under 24 hours

Saabsa · Austin HQ, US delivery

AI security and governance your security team can approve

Governance is not a policy PDF that never meets the system. Saabsa writes the data boundary, the access path, the human approval points, and the log review into the design—then builds those controls if the sprint says go.

Security blocks AI projects that cannot describe their data flow

An AI security assessment that only lists model risks will not unblock a deployment. Reviewers want to know what data is retrieved, what is sent to a model API, what is stored, who can see the transcript, and which actions can change a system of record. AI governance consulting that skips that diagram does not survive the meeting.

We produce that packet inside the production sprint. It is specific to the workflow. A generic responsible-AI essay is not the deliverable.

Data boundary

Classification, retention, and what is prohibited from leaving the tenant or reaching the model.

Access control

User identity applied to retrieval and tools. No shared key that sees every document.

Write approval

Irreversible actions wait for a person until evaluation supports a narrower rule.

Evidence

Logs security can sample, a vendor and model note, and an owner for exceptions.

Controls attached to implementation

The security note is an input to enterprise deployment, not a parallel workstream that finishes after launch. Healthcare work adds BAA and minimum-necessary constraints; those live on the healthcare AI page. Evaluation proves the assistant respects refusals and permissions; that is evaluation, and it is part of the same go/no-go.

We will not sell a governance retainer as the first purchase. If the workflow is not real enough to draw a data flow, the sprint ends in a no-go.

Questions buyers ask

Before you book the sprint

Is this a penetration test?

No. It is the design and the controls for the AI system: boundary, access, logging, and approval. A broader application test is a different engagement and is not implied here.

Do you write the company AI policy?

We write the control notes for the system we are implementing. Enterprise-wide policy programs are out of scope unless they are required to ship that system.

Can security reject the build?

Yes. The sprint is designed so that rejection is a documented outcome, not a surprise in month four.

What do we receive?

A security note your reviewers can mark up, tied to architecture and the evaluation plan, plus the go/no-go memo.

Bring the prototype, not a wishlist.

The AI Production Sprint is two weeks and fixed fee. You leave with a go/no-go, architecture and security notes, and a next-step quote you can decline.

Book a sprint call

Start with a 2-week production sprint

See the sprint